Latest News

  • UIN allotted to the newly appointed 13 Assistant Managers_27th March 2021 Read more...
  • Offer letter for the MPSC recruited Assistant Manager (Elect)-21/01/2021 Read more...
  • UIN alloted to the newly appointed JEA, JSA,OA & WCCA under DIH- 28/11/2020 Read more...
  • Allotment of Specific Identification Number (SIN) of MSPCL employees Read more...
  • Final Seniority list for the post of Assistant Manager (Fin & Acct) as on 01-10-2020 of MSPCL Read more...
  • Unique Identification Number (UIN) for newly appointed DM, AM_2020 along with 1(one) JEA & 3(three) JSA of 2018_19 Read more...
  • Tentative Seniority List for the post of Assistant Manager (Finance & Accounts) of MSPCL as on 01-10-2020 Read more...
  • Final seniority list for the post of Control Room Assistant of Manipur State Power Company Limited(MSPCL), as on 01-08-2020 Read more...
  • Tentative seniority list for the post of Control Room Assistant of Manipur State Power Company Limited(MSPCL) Read more...
  • Offer letter for the MPSC recruited Deputy Manager(Elect) & Assistant Manager (Elect)-02/07/2020 Read more...

Planned Shutdowns


(As per the Data Furnished by STATE LOAD DISPATCH CENTRE, SLDC, MANIPUR) 


 

  • PLANNED SHUTDOWN FOR THE MONTH OF – JULY 2021

 

 

Date of Shutdown TIME Name of Substation/ Line/ Feeder Purpose of Shutdown Approx Load to be Affected
FROM TO
01/07/2021  10:00 AM 04:00 PM Kongba-Kakching Jungle Clearance  0 MW
02/07/2021  10:30 AM 02:00 PM Heirangoithoi Jungle Cutting  2 MW
10/07/2021  8:30 AM 4:00 PM 33 kV Sekmaijin Mayang Imphal Shifting of Pole  0 MW
12/07/2021  10:30 AM 02:30 PM 33kV New Lamka – Singhat line Erection of Single pole(2) MDUI TI Sagging of Conductor  2 MW
12/07/2021  11:00 AM 03:00 PM 33kV New Lamka – Singhat line Erection of Single pole(2) MDUI TI Sagging of Conductor  1.5 MW
13/07/2021  8:00 AM 12:00 PM 11 kV Kangpokpi Segregation of Feeder  1.5 MW
13/07/2021  8:00 AM 02:00 PM 11 kV Uripok feeder removal of old corroded HT Pole and replace with new one  2 MW
15/07/2021  10:00 AM 12:00 PM 132 kV Ningthoukhong CCpur – 1 feeder Stringing  0 MW
15/07/2021  11:00 AM 03:00 PM 33kV New Lamka – Singhat line Erection of Single pole(2) MDUI TI Sagging of Conductor  1.5 MW
17/07/2021  11:00 AM 03:00 PM 11 kV Bazar Feeder Jungle Cutting  1.5 MW
21/07/2021  7:00 AM 10:00 AM 1) 11 kV Khuman-Kongba Line
2) 11 kV Minuthong Feeder
3) VIP SPORT
 Jungle Cutting  5 MW
24/07/2021  9:00 AM 4:00 PM 33/11 kV Sub-Station Wangjing  Completion of sending and line bay for 33/11 kV Moirang Palli from wangjing  3 MW

 


 


  • PLANNED SHUTDOWN FOR THE MONTH OF – JUNE 2021

Date of Shutdown TIME Name of Substation/ Line/ Feeder Purpose of Shutdown Approx Load to be Affected
FROM TO
06/06/2021  09:00 AM 11:00 AM 11 kV Kakwa & 11 kV Singjamei Feeder for 33kV CT connector replacement, CT oil tapping up and transformer oil tapping up 3 MW
06/06/2021 08:00 AM 04:00 PM 33 kV Elangkhangpokpi – Sekmaijin Rectification of 4 pole 2 MW
07/06/2021  11:00 AM 04:00 PM Hiyangthang Feeder & Nando Brickfield Jungle cutting 2.5 MW
16/06/2021 09:00 AM 01:00 PM 33/11 kV Sangaipat sub-station To attend oil leakage and oil tapping 3 MW
28/06/2021 10:00 AM 04:00 PM Yaingangpokpi – Kongba Jungle Clearance 0 MW
28/06/2021 09:00 AM 02:00 PM 33 kV Yurembam – Noney Erection of 1 Single Pole at Kotlen 1.5 MW
28/06/2021 09:00 AM 02:00 PM 11 kV Khongman Jungle Clearance 1.6 MW
29/06/2021 11:00 AM 03:00 PM Mantripukhri-2 jungle Clearance and line maitenance 1.5 MW
30/06/2021 11:30 AM 02:00 PM Mantripukhri-Nilakuthi line Jumpering and test charging of new Ibudhou Marjing 33kV substation 1 MW

 


  • PLANNED SHUTDOWN FOR THE MONTH OF – MAY 2021

Date of Shutdown TIME Name of Substation/ Line/ Feeder Purpose of Shutdown Approx Load to be Affected

FROM

TO

10/05/2021

 10:00 AM

02:00 PM

SINGJAMEI FEEDER

Line maintenance and jungle cutting

2 MW

10/05/2021

10:00 AM

01:00 PM

BRICKFIELD AND EASTERN-1 FEEDER (YUREMBAM)

Installation of additional power source to Oxygen plant

2.5 MW

12/05/2021

 10:00 AM

01:00 PM

BRICKFIELD AND EASTERN-1 FEEDER (YUREMBAM)

Installation of additional power source to Oxygen plant

2.5 MW